3/10/2024 0 Comments Sap md04 md05 differenceThere is a reservation on and a production order on. If the fixed element is after the requirement date, within the rescheduling horizon and this type of fixed element is included on the rescheduling check, according to the customizing, exception message “10 - Bring process forward” is displayed for the element. In this case, the exception message “15 – Postpone process” is displayed for the element. If a fixed element is found before the requirement date, then this receipt is not needed until later. System first searches for fixed elements before the requirement date. If a fixed replenishment element is found, an exception message is created, suggesting the user to reschedule this fixed element in order to cover the shortage. This procedure is called “rescheduling check”. Whenever the MRP finds a requirement, it checks if this requirement can be covered for an existing fixed receipt (within the rescheduling horizon), before creating a new replenishment element (planned order). The objective of this WIKI is to provide an overview of the MRP rescheduling check and examples of the most common issues and questions in this area.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |